Sorry I found no matches, Please try again. 176
vid = 365pws_id = 322689pws_id = 322689
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.117.153.38 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Ramsey Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Ramsey Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Ramsey Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Cambridgeshire    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 1.8 MW
Approx Date of 1st power generation: April 2015

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

This is the first wind turbine erected by Abbey in 1993. It was put in place to provide electricity for Abbey’s former The Abbey Group - Ramsey Site: Cold Storage facility which was located on the same site. Planning consent has recently been gained to replace this turbine with a new 80m hub height turbine which is due to be erected in June 2008.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Ramsey 2 Wind Farm St Marys Road Ramsey Cambs PE26 2SE England

 Associated Companies.

Relationship Company (For: Ramsey )
OperatorREG Windpower
OwnerREG Windpower
DeveloperREG Windpower

 DECC Data on this Project: Ramsey :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Ramsey Wind Farm Extension     8 MW
Energy Type: Wind Onshore
County: Cambridgeshire     Country: England     LPA: Huntingdonshire District Council
Site ID and Reference: 4414 / AA582     District:
Applicant: REG Windpower     Application : 1101865FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 8
Site Address: St Marys Road, Ramsey
 
County: Cambridgeshire Region: Eastern
OS Coordinates: 527645 / 527645
Development Status: Operational
Application Submitted: 11/8/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 11/1/2014    
Generator Live 4/23/2015 This Record Last Updated: 4/24/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Ramsey 1     1.8 MW
Energy Type: Wind Onshore
County: Cambridgeshire     Country: England     LPA: Huntingdonshire District Council
Site ID and Reference: 3155 / N00121W     District:
Applicant: REG Windpower     Application : 0300478/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.8
Height of Turbines: Calculated capacity: 1.8
Site Address: Rear of Packing Station St Mary''s Road Ramsey Cambs
 
County: Cambridgeshire Region: Eastern
OS Coordinates: 528800 / 528800
Development Status: Operational
Application Submitted: 3/11/2003 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 9/30/2008 This Record Last Updated: 3/31/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Ramsey: Wind :

Site Name: Ramsey 2 Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00326RQEN
Capacity: 8000 Status: Live
Accreditation Date: 3/11/2003    
Commission Date: 3/23/2015    
Applicant: REG Windpower Ltd.
Applicant Address: R E G Holdings Ltd Edgeborough House Upper Edgeborough Road Guildford GU1 2BJ England
Address: Ramsey 2 Wind Farm St Marys Road Ramsey Cambs PE26 2SE England

Site Name: Ramsey 2 Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G02698NWEN
Capacity: 8000 Status: Live
Accreditation Date: 3/11/2003    
Commission Date: 3/23/2015    
Applicant: REG Windpower Ltd.
Applicant Address: R E G Holdings Ltd Edgeborough House Upper Edgeborough Road Guildford GU1 2BJ England
Address: Ramsey 2 Wind Farm St Marys Road Ramsey Cambs PE26 2SE England
 
Assumptions: Capacity: 8000kW 8 MW,
Thus over the month Capacity * 720 hours per month = 5760 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/02/2018 2170 27.13% Issued
01/01/2018 3064 38.30% Issued
01/12/2017 2935 36.69% Issued
01/11/2017 2373 29.66% Retired
01/10/2017 2596 32.45% Retired
01/09/2017 1387 17.34% Retired
01/08/2017 1167 14.59% Retired
01/07/2017 1105 13.81% Issued
01/06/2017 1776 22.20% Retired
01/05/2017 1628 20.35% Issued
01/04/2017 1476 18.45% Issued
01/03/2017 2507 31.34% Issued
01/02/2017 2168 27.10% Issued
01/01/2017 1818 22.73% Issued
Dec-16 01686 1874 23.43% Pending Tr
Nov-16 01795 1994 24.93% Pending Tr
Oct-16 01442 1603 20.04% Pending Tr
Sep-16 01530 1700 21.25% Pending Tr
Aug-16 01445 1605 20.06% Pending Tr
Jul-16 01275 1417 17.71% Pending Tr
Jul-16 01275 1417 17.71% Pending Tr
Jun-16 0936 1048 13.10% Pending Tr
May-16 01543 1715 21.44% Pending Tr
Apr-16 01352 1502 18.78% Pending Tr
Feb-16 02170 2411 30.14% Redeemed
Nov-15 02748 3053 38.16% Redeemed
Oct-15 01341 1490 18.63% Redeemed
Sep-15 01163 1292 16.15% Redeemed
Aug-15 01309 1463 18.29% Redeemed
Jul-15 14021262 1402 17.53% Redeemed
Jun-15 14371293 1437 17.96% Redeemed
May-15 13491214 1349 16.86% Redeemed
Apr-15 941840 942 11.78% Redeemed
Mar-15 125108 126 1.58% Expired

 Calculations


Capacity: 18
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 5/8/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 18 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 322689

Project Info
UK: Vestas for 10MW St Breock Repowering and 8MW RAMSEY Extension
Renewable Energy Generation Limited (REG) has placed orders with Vestas-Celtic Wind Technology Ltd, for five V80 2 MW turbines for the St Breock Repowering project in Cornwall and four V90 2 MW turbines for the RAMSEY Extension

Solar farm gets planning permission for St Ives site
Kettering-based Street Energy Limited has been given planning permission by Huntingdonshire District Council to build a 6.75MWp solar farm on land at Wiggin Hill Farm in Old RAMSEY Road.

The Abbey Group

REG Wind Power RAMSEY Extension

REG Windpower

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School